Air Source Heat Pump Install — Sevenoaks

Sevenoaks
Commercial
CASE STUDY

Windmill Park - Case Study

Upgrading to a sustainable heating system isn’t always straightforward. For this project, routing pipework from two heat pumps to the cylinder cupboard presented a unique challenge.

However, our team designed an efficient solution, ensuring the system not only worked seamlessly, but also provided a future-proof, eco-friendly and cost-effective heating solution for our client.

Challenges:

We designed and installed two heat pumps to run at a 55˚ flow temperature. This allowed us to re-use all existing radiators apart from 3 in the living and dining room areas. These areas required slightly higher heating due to the size and construction of the rooms, all meeting our client’s comfort.

Project Key Facts

2x Grant 10KW Aerona3 55˚˚˚˚ Flow Temp—Replacing existing gas boiler

1x 300L Grant Heat pump cylinder twin coil

Project Images

See how our Sustainable

heating solutions can benefit your projects

No matter what stage of a project you are at, we would love to speak with you and find out more about your needs and how we can help.


Contact us today below

More Case Studies

Scroll to Top