Air Source Heat Pump Install — Oxshot

Oxshot
Commercial
CASE STUDY

Foxholes - Case Study

With over 400m² of floor space spread across three floors, this new build required an efficient, future-proof heating solution. As new builds rise and government-backed heating incentives make eco-friendly options more accessible, heat pumps are becoming the go-to choice.

From April 2025, gas boilers will no longer be permitted in new builds for heating and hot water, making the Aerona³ Grant heat pump the perfect solution—delivering optimal performance and energy efficiency for this large property.

Resolution:

To meet the requirements of the property we designed a system layout that works on extremely low temperatures, increasing the efficiency of the appliance. The team installed a single unit providing heating and hot water throughout the year.

Project Key Facts

17KW Grant Aerona3 35˚ Flow Temp – New Build

400L Telford Tempest cylinder

Project Images

See how our Sustainable

heating solutions can benefit your projects

No matter what stage of a project you are at, we would love to speak with you and find out more about your needs and how we can help.


Contact us today below

More Case Studies

Scroll to Top