Air Source Heat Pump Install — Guildford

Guildford
Commercial
CASE STUDY

Grist Hill Stud Farm - Case Study

When our client in Guildford sought to replace their Biomass boiler with a cost-effective alternative, we knew this project would require a unique solution. The challenge was to design a system that would supply both a commercial building and a separate domestic dwelling with independent hot water storage and underfloor heating.

Our team developed a sophisticated heat pump system that met the needs of both spaces, reducing costs while ensuring optimal performance and energy efficiency throughout.

Resolution:

We installed a unique heating system meeting the multiple heat requirements for both domestic and commercial buildings.

The team designed a hot water and underfloor system with several different flow temperatures.

Project Key Facts

1x Grant 13KW Aerona3 45Flow Temp—Relacing BioMas Boiler

2x Grant quick recovery pre-plumbed cylinder

Project Images

See how our Sustainable

heating solutions can benefit your projects

No matter what stage of a project you are at, we would love to speak with you and find out more about your needs and how we can help.


Contact us today below

More Case Studies

Scroll to Top