Air Source Heat Pump Install – Southwark
CASE STUDY
Case Study - Southwark
Unusual Aspect – We initially installed the primary pipework along the rear elevation of the property; however, the client was not satisfied with its appearance. Consequently, we revised our approach and relocated the pipework underground to better meet the client’s expectations. In addition, we constructed a new, suitably reinforced floor within the cupboard to provide adequate support for the cylinder and ensure a stable installation.
Challenges:
- Due to the late change to the primary pipework design, we had to quickly adapt and install the revised routing at short notice to maintain progress on the project.
- As part of the change to underground pipework, we excavated a trench through the garden. Although this work took longer than initially anticipated, it was completed efficiently and within the required project timeframe.
- The newly constructed cupboard floor had to be properly levelled and reinforced to safely support the full weight of the hot water cylinder when in operation.
Project Key Facts
Design flow temperature – 50 Celsius
Total heat loss – 10502 W
SCOP rating – 5.40
Grant Aerona3 13KW R32 Air Source Heat Pump
Grant quick recovery 250L pre plumbed, single coil hot water cylinder with smart controls
Retro Fit Installation