Air Source Heat Pump Install – Southwark

CASE STUDY

Case Study - Southwark

Unusual Aspect – We initially installed the primary pipework along the rear elevation of the property; however, the client was not satisfied with its appearance. Consequently, we revised our approach and relocated the pipework underground to better meet the client’s expectations. In addition, we constructed a new, suitably reinforced floor within the cupboard to provide adequate support for the cylinder and ensure a stable installation.

Challenges:

  • Due to the late change to the primary pipework design, we had to quickly adapt and install the revised routing at short notice to maintain progress on the project.
  • As part of the change to underground pipework, we excavated a trench through the garden. Although this work took longer than initially anticipated, it was completed efficiently and within the required project timeframe.
  • The newly constructed cupboard floor had to be properly levelled and reinforced to safely support the full weight of the hot water cylinder when in operation.

Project Key Facts

Design flow temperature – 50 Celsius

Total heat loss – 10502 W

SCOP rating – 5.40

Grant Aerona3 13KW R32 Air Source Heat Pump

Grant quick recovery 250L pre plumbed, single coil hot water cylinder with smart controls

Retro Fit Installation

Project Images

See how our Sustainable

heating solutions can benefit your projects

No matter what stage of a project you are at, we would love to speak with you and find out more about your needs and how we can help.


Contact us today below

More Case Studies

Scroll to Top